Pool Forge Covered Bridge

Covered bridge · Pennsylvania

Pool Forge Covered Bridge in Pennsylvania
Photo: Doug Kerr from Albany / Wikimedia Commons, CC BY-SA 2.0

Built in 1859 by Levi Fink, this red Burr-arch truss bridge carries a quiet lane over the Conestoga River in Lancaster County, Pennsylvania's covered-bridge capital, with roughly 200 spans statewide. It sits free and open in a small township park beside a colonial-era ironmaster's house.

Best for: Lancaster County covered-bridge touring

Don’t miss

  • Built 1859
  • Burr-arch truss over the Conestoga River
  • Free public park setting
2026 Forecast

Color nearby peaks: October 26–October 30

Color builds from October 14 · mostly bare by November 19

Color starts: October 14Peak: October 28Bare: November 19AugustDecember

Sampled at Pool Forge Covered Bridge’s own coordinates and elevation (147 m) rather than a regional average.

Pennsylvania is sampled at 22 weather points, then moved 3 days later so the model agrees with 2 published peak dates from almanac.com and smokymountains.com. How the forecast works

When to go to Pool Forge Covered Bridge

Good color holds through about November 6, giving you roughly 23 days from the first turn to past peak. Against Pennsylvania overall, that is 11 days later.

It is roughly 45 mi out of Philadelphia. Baltimore is about 67 mi out.

Pool Forge Covered Bridge on the map

Drag the date slider to see when color reaches this corner of Pennsylvania, or tap a pin for that stop’s own peak window.

More things to do in Pennsylvania

See all things to do in Pennsylvania →

Plan from a city

Frequently asked

When does Pool Forge Covered Bridge peak in 2026?
Peak color is predicted for October 26–October 30 (best estimate October 28). Color starts around October 14 and is mostly bare by November 19.
How do I get to Pool Forge Covered Bridge?
The closest city is Philadelphia, about 45 mi away. It's part of Pennsylvania's fall lineup.

Own or manage Pool Forge Covered Bridge? Update your listing or get in touch.